Child pages
  • Contributions

ONF OIMT & OTCC 2018.03 London Interim Meeting Agenda Plan

Meeting Venue: Ciena at 43-51 Worship Street, London, EC2A 2DX, UK

 

Timing

Monday – Thursday: P1 (9:00 – 10:30) break P2 (11:00 – 13:00) Lunch (13:00 – 14:00) P3 (14:00 – 15:30) break P4 (16:00 – 17:30)

Friday: P1 (9:00 – 10:30) break P2 (11:00 – 13:00) Lunch (13:00 – 14:00) P3 (14:00 – 15:30) break P4 (16:00 – 17:30)                                          

 

Room allocation (see floor plan at end of this document):

Monday, Tuesday and Friday

  • One track only (20+): Combined Rayleigh-Shannon (The tables can be reconfigured)

Wednesday and Thursday: 

  • OIMT & OT-IM & TAPI (10): Shannon
  • WT (13): Rayleigh

Note: Cerf is available for breakouts for most of the week.

Remote Participation:

  • WT:
    • Tuesday, Wednesday, & Thursday: GoToMeeting URLs in the table below
      • More details in


 

Day

P

OIMT & OT-IM & TAPI Joint

WT

Mon

12 th

 

20

Remote participation: https://ciena.zoom.us/j/390125329

  • No WT session

1

Admin [10 minutes] (Nigel/Kam)

  • Meeting logistics
  • Agenda summary
  • Document List

UML Modelling Guidelines (Bernd)

  • Complex constraints and dependencies… State requirements etc (and perhaps discuss OCL and need for DSLs)?
  • Where do we put Copyright/license information in UML etc
  • Bidirectional associations and redundant associations (in context of the roles of the models)
  • Association classes (including Nigel’s document on associations)
  • Atomic-composite v component-system
  • Decorator

Document :

  •  

2

UML Modelling Guidelines (Bernd)

  • (continuing topics from above)

Document :

  • Xx

 

L

Ad-hoc TOSCA feedback (Nigel)

3

Termination model & Transitional Link (Karthik)

Document :

  • xx

 

4

Termination model & Transitional Link (Karthik)

Document :

  • xx

 

 

 

OIMT, OT-IM, WT & TAPI Joint

Tue

13 th

 

22

Remote participation: https://global.gotomeeting.com/join/933295229

1

  • Overview of TR-512 v1.3.1 and high-level updates in v1.4 (Nigel/Kam)
    • Constraint domain, Control Constructs
  • High-level update of TAPI (Karthik)
  • High-level update of WT (including 5 th PoC)

Document :

  • xx

2

  • Model migration (Martin/Nigel)
  • Documentation of deprecation/obsolete

Document :

  • xx

L

Ad-hoc session on TR-512 V1.5 Functional Protection (CD etc. ) (Nigel)

3

  • Sync-mgmt model

  Document :

  • xx

4

  • Sync-mgmt model

  Document :

  • xx

Wed 14 th

 

23

(10, 13)

7 th  

Remote participation: https://ciena.zoom.us/j/390125329

https://global.gotomeeting.com/join/186301213

1

Control domain, Control Constructs, Peer-to-Peer control (Chris/Nigel/Malcolm) + Zoom

Document :

  • xx
  • open issues of TR-532 for R.1.1 (James lead)

 

2

Entity Lifecycle (Malcolm)

Document :

  • xx
  • Device Management Interface Profile and Requirements (Thorsten lead)

 

3

OAM model (Andrea) + Zoom

Document :

  • xx
  • PoC5 Use cases and organization (Giorgio lead)

4

OAM model (Andrea) + Zoom

Document :

  • xx
  • ONAP Use cases and Next Integration steps (with remote participation from AT&T)

 

Thu

15 th

 

23

 

(10,13) 

Remote participation: https://ciena.zoom.us/j/390125329

https://global.gotomeeting.com/join/307696661

1

Software document overview (Chris) + Zoom

Document :

  • xx
  • open issues of TR-532 for R.1.1 (James lead)

2

Operations pattern and Control Construct model (Nigel)

Document :

  • xx
  • Device Management Interface Profile and Requirements (Thorsten lead)

 

   3

OTSi, ODU and OTU Spec models (Karthik) + Zoom

Document :

  • xx
  • spare time for item not concluded in the previous sessions.

4

OTSi, ODU and OTU Spec models (Karthik) + Zoom

Document :

  • xx
  • Conclusion and next steps

Fri 16 th

 

21

Remote participation: https://ciena.zoom.us/j/390125329

 

1

UML-Yang mapping (Bernd)

  • Where does copyright etc info go in Yang
  • Yang catalogue registration
  • Influence of NMDA

Document :

  • xx

No WT sessions

2

System/Scheme Spec model exploration (Nigel)

Document :

  • xx

 

3

Ad-hoc (including Liaisons)

 

4

Ad-hoc

 

 


Floor plan