Child pages
  • Contributions
onf2017.154IMP Work Items for future release V1.4: 7/2018V1.5: 4Q2018Kam & Nigel need to work out the publication schedule (after the prep call)
Participation - L = Lead, P = actively Participate
ItemShort NameTR-512 sub docReleaseChris HNigel DKam LBernd ZMalcolm BRod LQilei WXiang YYuji TItalo BXing ZKarthik SSteve SAndrea MScott MSibylle SAugie JRick JingPriorityStart DateDraft dateTarget DateBrigade Process ?Nov. Meeting DeliverableLong Description
1Controller81.4LPPPP?P8-JunFeb-18Controller model and NE deconstruction (at least some more examples)
3Specification71.4LPPP 25-Sep8-JunFeb-18Spec model (with Tapi) * Especially scheme spec related to the photonic model
4Software121.4LPP8-JunFeb-18Modelling of software, Good material from TMF TR-225 * And relating it to hardware and emergent function
Software exampleA.13L8-Jun
5OAM91.5PPPPPPPL P25-SepNov-17NoOAM (called for by Tapi); For November delivery generalize whatever in the current TAPI OAM
6Resilience51.5PP?LNoResilience examples (as called for by TAPI)
8Equipment enhancements61.4L 8-JunEquipment (as called for by TAPI). Chris: mix a lot of core framework with other stuff, Nigel: May need a strong story for v1.3.1 * Spec of capability; * Defining the properties of the equipment; * Equip - function (in the PC) Move the spec to 1.5
10Operation Patterns101.4LPPPP8-JunModel patterns to support operations patterns including intent, TOSCA and policy (with Boulder), query More than just intent Join the operation pattern into the control
12Entity lifecycle31.5PPLPPP2-OctFeb-18Lifecycle of entities (including split and join) * Dynamic view/abstraction/virtualization
15RationaleA.31.4L 2-Oct8-JunNov-17 1.3 overhang: Modelling rationale, ...
16P&R Methodology1.4LPPPrune &Refactoring methodology and tooling
17UML GuideTR-5141.4PLPFeb-18UML Modeling Guidelines
18Papyrus GuideTR-5151.4PLPFeb-18Papyrus Guidelines
19UML-YANG GuideTR-5311.4PLPPFeb-18Mapping Guidelines
20UML-OAPI GuideTR-5431.4Mapping Guideines
22UML-Yang Gen1.4UML-Yang Generator
23UML-OAPI Gen1.4UML-OAPI Generator
25P&R Tooling1.4PL
27UML-Protobuf GuideTR-5441.4LP?Done
31Layer Examples (packet)A.61.4PPPL P?25-SepMarchNoMore examples of layers (as called for by TAPI etc) * Defer L0 (media (photonic and wireless)) Analogue; * Focus on L1/2 Circuit; * L2/3 (inc LAG) Packet; * Multilayer etc
2Processing Construct111.4LPPP?PDoneNoSlide pack for TOSCAPC/Component/VNF/TOSCA * Should we continue to have ControlComponent as a specialized class of PC/Component
13Model StructureA.21.5LPNoModel structure & model patterns, Chris: cycle of model, need architecture of the model, Nigel: need cleaning
14Topology4 1.5LPP?P25-SepTopology stuff outstanding (IETF TEAS comparison). Fix ForwardingEntity _PAC model (should be decoration/spec); Per TAPI request, need to develop examples of usage of the topology Pacs. Consider pull this for 1.4 for TAPI needs.
21UML-TOSCA Guide1.5PPLHMapping Guideines
24UML-TOSCA Gen1.5LUML-TOSCA Generator
26Intent1.5LPP?P?P?28-SepBrigade (joint with ONOS)Could lead to use the operation patterns; could be merged into operation patterns
28UML-Protobuf Gen1.5PL?
29Party model1.5LP
30Location model1.5LP
7Layer Examples (circuit)A.51.4L March
9IP1.5?PPIP driven by requirements from ECC/DCN ensuring we have core support (IMP, OT, TAPI brigade * Extending over time to “full” IP via appropriate collaboration and federation
11Views1.5?L?PView abstractions and virtualisation
32Photonic model examplesA.41.4L8-Jun