Child pages
  • 2021-07-15 OIMT Meeting notes
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

Date

Attendees

Agenda

  • Admin (5 min max)
  • Progress of v1.5 TR-512.2, TR-512.4, TR-512.5 (Nigel)
  • Review initial draft of new TR-512.A.15 Controller Lifecycle & Security Consideration (Nigel) 
  • Feedback on Simplifed Spec (Chris)
  • AOB

Discussion items

Time

Item

Who

Notes

5 minAdministrativeKam/Nigel
Nigel noted that we need to watch the ORAN and TIP MUST (Mandatory Use cases requiements for SDN Transport) activities. They may have a LS to us shortly. There may be future engagements on how to use TAPI in TIP MUST and Core model in ORAN.
  minProgress of TR-512 v1.5Nigel

Nigel reported on the progress of TR-512 v1.5.

  • The Gendoc output documents of TR-512.2 "Forwarding and Termination", TR-512.4 "Topology", and TR-512.5 "Resilience" were generated successfully - with the right diagrams.
  • The content of the diagrams and tables were checked and look fine.
  • Just need to fix the numbering of the diagrams and tables.

Will make the documents available.

Will do TR-512.6 (Physical) & .8 (Control) next week.

Will do TR-512.17 in 2 or 3 week later. 

  min

TR-512.A.15 (v1.6)

Nigel

Draft new TR-512.A.15 "Controller Lifecycle & Security Consideration" (for v1.6)

Malcolm will review and provide feedback. 


Feedback on Simplied SpecChris

Chris ran through his feedback to Nigel's vF2F Simplied Spec Pattern (2021 Jun 01-04 : OIMT Virtual Face-to-Face). 

  • ND: Using modern modeling languages as examples is good.
  • LN: Constraint at network planning stage.
    • CH: can be done by using Spec (knowledge layer, description class)
  • LN: Approach of expressing constraint.
0 minNext calls

 Planned agenda items

  • Progress of TR-512 v1.5
  • Feedback on TR-512.A.15 (v1.6)

Future call agenda items

  • RBAC vs ABAC (June 2021 F2F meeting Tue 1.2 ) 
  • Finalize the write up on Multi-point Media Channel (later call)
  • To recap the previous OIMT discussion on synchronization management IM (later call)
  • YANG augmenting 

Action items

  •  
  • No labels