Plan
- Meeting planning proposal (where each meeting will deal with the corresponding actions (with the date of the meeting)):
-
- Aggregate application to LTP (ND, MS)
- Overview of Control Task documentation
- OAM draft document review
-
- Temporal draft document review
- Equipment discussion/resolution and preparation for delivery of document
- Validate progress and plan model and documentation development
- Review all relevant minutes/action resolution and draft document progress against plan including
- Streaming (T65)
- Task (T57)
- Equipment (T8a)
- Temporal (T73)
- Spec (T56)
- OAM (T5)
- Aggregate (T64b)
- Views/Context (11b)
- TR-512.A.15 (and corresponding TR-512.8)
- This includes some aspects of controller zero trust (T78)
- Consider progress on and plan for delivery of
- Compute and storage (T36)
- Media multipoint addition to .A.4 (T77)
- Construct detailed action plan for delivery on target date
-
- Review draft streaming document material (part of TR-512.8).
-
- At each meeting we should check that we are on track for the planned items
Future calls agenda items for consideration
- TIP/MUST papers (CH, ND)
- Catalog / inventory storage application (CH, ND)
- IETF work on physical inventory model (ND)
- RBAC vs ABAC (June 2021 F2F meeting Tue 1.2 )
- Finalize the write up on Multi-point Media Channel (later call) (Candidate for v1.6)
- To recap the previous OIMT discussion on synchronization management IM (later call)
- YANG augmenting
- Leo on location model