Child pages
  • Agenda Plan of 2019 March 18-22 ONF OIMT & OTCC Sydney Meeting

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

DayPeriodTopic (Lead & Work Item)Document / LinkComment

Monday

18th

1.1
  • C9 Job model (CH #57)

  • C7 Identify model (CH #41)

1.2
  • T8 Link capacity (MB)

1.3
  • T1 Connectivity & Topology (KS, AM)


1.4
  • T3 Topology Pac (ND)

  • T6 TAPI VN (KS, ND)

Tuesday

19th

2.1
  • T12 Photonic connectivity (AM, KS)
Send ZOOM invitation to Stephane & Stephen to dial-in
2.2
  • T9 ML Transitional link (AM)

2.L
  • C14 Datatype (All)

2.3
  • C1 Equipment (ND #8)
Will be using the model from TAPI Github https://github.com/nigel-r-davis/TAPI
2.4
  • C1 Equipment (ND #8)

Wednesday

20th

3.1
  • T12 Alarm/TCA Notification/OamProfile Framework (KS, AM)


3.2
  • T4, T5 (& C11) Catalog driven API & Operation pattern (KS)

3.3
  • C2 LTP Port (ND #53)


3.4
  • C3 IP model (KL #9, #53)


  • C6 Model refactoring (CH/ND #13)


Thursday

21st

4.1
  • T2 Routing (AM)


4.2
  • C8 Streaming (ND #39)
oimt.2019.ND.009.01_ProvidingAndMaintainingAView.pptx (ND)
4.3
  • C5 Spec re-work (ND #37)

Contribution will be late
4.4
  • C5 Spec re-work (ND #37 (#44, 56, 58))

Contribution will be late

Friday

22nd

5.1
  • C4 TOSCA profile (CH #55, #26?)


  • C13 Profile & Template (ND #57)
 oimt.2019.ND.008.00_PropertyValueProfiles.pptx (ND)
5.2
  •  Review of work item XLS & F2F action items (KL)

...