Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3
    • Date

26 September 2017

Attendees

Goals

Discussion Items

TimeItemWhoNotes
1AdministrativeGiorgio Cazzaniga
  • IMPORTANT: PROPOSAL TO MOVE WT  WEEKLY CALL TO WEDNESDAY (same time)
2ModelThorsten Heinze
  • For Ethernet PHY model discussion has been held on OTIM call
  • Proposal to proceed in parallel with:
    • OTIM: focused on where to attach the Ethernet PHY model to the Core model
    • TAPI: interface description and TR document
    • WT: deep parameter diving

(see OTIM meeting minutes: 2017-09-26 OT-IM Meeting Notes)

  • The proposal to move the WT call to wednesday is to allow the participation of WT team to OTIM and TAP calls
  • Other topics for model extension:
    • Point to multipoint
    • Array antennas
3PoC4-1Martin Skorupski
  • Scope of the PoC: retrieve of the inventory through AAI interface (ONAP architecture) from ODL SDN Controller
  • On southband the Equipment model and inventory model is requested from equipment vendors
  • Round-table about possible participation of the vendors attending the call:
    • Ceragon: no official position yet
    • NEC: to be checked
    • Nokia: we need James for an official statement
    • Ericsson: to be checked
    • ZTE: possibility to participate from remote labs
    • SIAE: one week needed for decision
  • ONAP: ongoing the ONAP meeting in Paris: see the following slides: https://rs.opennetworking.org/wiki/download/attachments/265093121/5G%20RAN%20Slicing%20and%20Optimization%20Framework%20v5.pptx?api=v2

Action Items

  •