Child pages
  • 2023-01-26 OIMT Meeting notes
Skip to end of metadata
Go to start of metadata

Date

Attendees

Agenda

  • Admin
  • Discuss comments on the TR-512.8 Control
  • AOB

Discussion items

Time

Item

Who

Notes

3 minAdmin

All

Virtual meeting 2Q

  • Date: 3-6 April 2023
      • Time 6:00 - 9:00 am US EST,
        • Overall prefer to move the time to 2 hours later on each day.
        • Will double check with colleagues in Asia if they have serious problem with 2 hours later.
      • Note that daylight saving start: US March 12, Europe March 26, Australia April 2
      • Will prepare by mid-Feb the agenda topics and time slots.
50 min

TR-512.8 Control


ND

Discussion of the review comments on TR-512.8 Control for v1.6

  • Version 5 of draft TR-512.8 v1.6 has been posted at https://wiki.opennetworking.org/download/attachments/266141701/oimt2022.ND.007_TR-512.8_OnfCoreIm-Control.docx?version=5&modificationDate=1674002671378&api=v2 on Jan. 17 for review.
  • Main updates are on Section 5 ControlTask and Section 7 Providing information (Streaming).
  • Review comments received from Andrea, Kam, and Malcolm..
  • Nigel noted that he will address by himself the straight forward comments, such as the editorial and format related comments
  • The following comments were discussed  
    • 5.1.5 
      • Will update the 2nd sentence to "The Task can act upon....".
      • Will reword the last sentence to something like "The Task will operate through an ExposureContext that contains .a subset of all the resources."
    • 5.1.15
          • Will reword the last sentence of the first paragraph.
    • 7.2 
      • Will add a forward reference
    • 7.3 Summary of Steaming Characteristics
      • Will change the section title to "Overview of Streaming Characteristics"
    • 7.3 Item 8 
      • Will change to something like "Allows the client to request previous records".  
    • 7.5.2.2
      • Will make the paragraph "May want ..." a footnote
    • 7.5.4
      • Will add reference to spec model and brief explanation.
    • 7.5.4
      • The next paragraph: "A similar ...."
      • Will add explanation
    • 7.6.5
      • Will add description.
  • Andrea's comments
    • 7.1, 
      • "It is assumed that there will be one or two clients for each stream type" is not a restriction. Will add that there may be many stream types
      • "The client that is closing ..." Short lived .. Specific (e.g. GUI)

Will update and further review/discuss in the OIMT call next week. 


Plan of next calls

Feb. 2

Feb. x

  • IETF I-D generation: Nigel will provide a pre-tool format example

Action items

  •