Child pages
  • 2018-10-04 OIMT Meeting Notes
Skip to end of metadata
Go to start of metadata

Date

04 October 2018

Attendees

Apology

  • Bernd Zeurner

Goals

  • December 4-8 Meeting agenda plan
  • 3Q 2018 deliverable status
  • ONF CIM Introduction
  • Work items review
  • TAPI - photonic & OTSi model

Discussion Items

TimeItemWhoNotes
IM-DDec. 4 - 8 Meeting
 2019 meetings planning 
  • 1Q: March 18 - 22, 2019 Meeting confirmed
    • Location: Sydney, Australia
    • Host: Cisco
    • 2 rooms reserved
  • 2Q in Asia (China, Japan), need host
  • 3Q in Europe, need host (Nokia?, Huawei?, Ciena?)
  • 4Q in California, co-located with ONF event ? 
 3Q Deliverable 
  • Status:
    • TR-512.A.2 Model Structure Patterns and Architecture:
      • Comments received from Stephen
    • TR-512.7 Specification:
      • Partial set of comments received from Andrea
  • For future release:
    • Should have parallel editing to share the work load
    • Shoudl consider partial release, e.g., could release a subset of the suite, instead of the whole suite at once.
 ONF CIM Introduction 
 Work Item review & Prioritize 
  • oimt2018.KL.001.08_oimt-work-items
    • New document number assigned:
      • TR-512.13: Party model (work item #29)
      • TR-512.14: Location model (work item #30)
      • TR-512.P.1: Presentation series overveiw (work item #47)
      • TR-512.P.2: ONF CIM Introduction (work item #48) Lead: Chris H.
      • TR-512.W.1: White paper series overview (work item #49)
      • TR-512.W.2: Backward Compatibility (work item #50) Lead: Nigel D. and Martin S.
    • New items added:
      • #51: Application of Equipment model and Spec
      • #52: Application of Software model and Spec
      • #53: IP Routing (Segment Routing)
      • #54: Cloud Native (Kubernetes, Istio, Containers)
IM-ETAPI - Photonic model 
  • NMC
    • Use central frequency for NMC
  • Connectivity Service use case
    • Initial view (OLS), no connectivity yet, only the topology view
      • Associate SIP with NEP then can make connectivity service
    • Create/Delete NMCA connectivity services
      • After realization: Connectivity Service points to the created SMCA, which in turn points to the NMCA
      • Full Details
    • Create SMCA service (without NMC information)
    • Disaggregation (optical ROADM and ILA only)
  • SIP to SMCA pool: two alternate approaches
    • vs
  • SIP associate with SMC or PHY
    • PHY is the OPS (Optical Physical Section)
    • May need to put the PHY back
 WT Not discussed

Action Items

  •